Industrial-Grade HDPE Packaging Built on Systems, Not Shortcuts
Manufacturing high-strength drums for chemical, pharmaceutical, and food industries. Process-driven production.
IIP-certified testing. Predictable delivery.
18+ Years Manufacturing Experience
IIP-Certified Testing Standards
FDA-Approved HDPE Materials
Manufacturing Discipline That Ensures Consistency .
Our facility operates on process-driven principles. Standardized protocols, automated quality checkpoints, and complete batch traceability ensure every drum meets the same quality standard.
Complete batch traceability
FULL OPEN TOP DRUMS
| Model | Capacity | Height | Diameter | Brimfull |
|---|---|---|---|---|
| 30L FOT | 30 L | 540 mm | 325 mm | 35 L |
| 30L FOT (Screw) | 30 L | 535 mm | 325 mm | 35 L |
| 120L FOT | 120 L | 800 mm | 486 mm | 132 L |
NARROW MOUTH DRUMS
| Model | Capacity | Height | Diameter | Mouth | Brimfull |
|---|---|---|---|---|---|
| 30L Jerry Can (SM) | 30 L | 490 mm | 390 mm | 50 mm | 32 L |
| 50L Narrow Mouth | 50 L | 557 mm | 392 mm | 25 / 50 mm | 54 L |
| 100L Narrow Mouth | 100 L | 715 mm | 486 mm | 25 / 50 mm | 118 L |
WIDE MOUTH DRUMS
| Model | Capacity | Height | Diameter | Mouth | Brimfull |
|---|---|---|---|---|---|
| 35L Wide Mouth | 35 L | 425 mm | 363 mm | 152 mm | 35 L |
| 50L Wide Mouth | 50 L | 540 mm | 392 mm | 152 mm | 57 L |
| 100L Wide Mouth | 100 L | 715 mm | 486 mm | 205 mm | 116 L |
Trusted by Critical Industries
Chemical
Acids, solvents, industrial chemicals
Pharmaceutical
APIs, pharmaceutical-grade materials
Food & Beverage
Pickles, oils, food-grade liquids
Allied Industrial
Paints, adhesives, lubricants
Ready to Evaluate Supply Fit?
Let’s Connect
Plus Barrels can boost your team’s supply chain reliability
- Evaluate your supply fit with a specialized industrial packaging expert
- Review tailored supply schedules for your bulk and recurring volume needs >
- See how our validated inventory systems ensure on-time delivery for every order
Trusted by 350+ enterprises, market leaders, and high-stakes manufacturers across 10 states




Rigorous Testing Reduces Buyer Risk
Every batch undergoes IIP-standard validation to ensure structural integrity.
Testing Protocols :
Leakage Testing: Every 50-production count
Drop Testing: 1.5m per IIP standards
Stack Load Testing: 3-drum vertical validation
Client Experiences That Speak for Themselves
“Finovate has been instrumental in our growth. Their team took the time to truly understand our needs and helped us eliminate inefficiencies.”
“Partnering with Finovate was a game-changer for us. They took the time to understand our challenges and helped us streamline our operations for success.”
“I hired Finovate for a small project & was very happy. He not only answered all my questions, but he didn’t treat me like a “small project”.
I was very satisfied & would recommend.”
Our Latest Insights
Proprietary data, expert analysis and bold thinking for leaders who want to achieve the extraordinary.
Frequently Asked Question
Minimum order quantity?
Part-load to full truckload. Share your needs and we’ll confirm.
Lead times?
Typically 2-4 weeks for standard products. We communicate realistic timelines upfront.
Samples available?
Yes, for potential large-volume orders.
Documentation provided?
Testing reports, material certificates, batch traceability available.
Our Clients





















